Master Schedule Reports

Note: There is an Aspen System Reports user guide that shows examples of all the reports that come standard with Aspen. It is available from the Help menu > User Guides > Aspen System Reports. Flip through it to become more familiar with the offerings.

You can run the following master schedule reports:

To run a master schedule report:

  1. Log on to the School view.
  2. Select Schedule > Master.
  3. Select Options > Reports > report name.
  4. Fill out the fields in the pop-up.
  5. Click Run.